EasyManua.ls Logo

GE Vivid S6 N - Page 805

GE Vivid S6 N
834 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
GE
P
ART NUMBER FN091065, REVISION 2 VS5 N AND VS6 N SERVICE MANUAL
Chapter 10 - Care and Maintenance 10-5
PRELIMINARY
Table 10-2 Customer Care & Maintenance Task Schedule
Service at Indicated Time Daily Weekly Monthly Annually Notes
Clean Probes
Clean Gel Cup
Clean Probe Holders
Clean Air Filter
More frequently if necessary, depending on
the environment
Inspect AC Mains Cable
*• *Mobile Unit Check Weekly
Inspect Cables and Connectors
Clean Console
Clean Monitor
Clean Keyboard (KB)
Clean Trackball
Inspect Wheels, Casters, Brakes and
Swivel Locks
*•* Mobile Unit Check Daily
Check Control Panel Movement
*•* Mobile Unit Check Daily
Console Current Leakage Checks
Also after corrective maintenance,
or as required by your facility’s QA program.
Peripheral
Current Leakage Checks
Also after corrective maintenance,
or as required by your facility’s QA program.
Surface Probe
Current Leakage Checks
Also after corrective maintenance,
or as required by your facility’s QA program.
Endocavity Probe Current Leakage
Checks
As prescribed in the Probe Manual.
Transesphongeal (TEE) Probe
Current Leakage Checks
As prescribed in Probe Manual.
Surgical Probe
Current Leakage Checks
As prescribed in Probe Manual.
Measurement Accuracy Checks
Also after corrective maintenance,
or as required by your facility’s QA program.
Probe/Phantom Checks
Only recommended if required by your
facility’s QA program.
Functional Checks
Also after corrective maintenance,
or as required by your facility’s QA program.
BIOS Battery
*
It is recommended to replace the BIOS
Battery once every two years.
System Battery
*
It is recommended to replace the system
Battery once every two years.

Table of Contents

Other manuals for GE Vivid S6 N

Related product manuals