System Setup
3-32 Vivid T9/Vivid T8 – Basic Service Manual
5795591-100 English Rev. 3
3-8-3-4 ECG Installation
3-8-3-4-1 Tools
No special tools needed.
3-8-3-4-2 Manpower
One person 5 min.
3-8-3-4-3 Preparations
1. Unpack the ECG.
2. Ensure no physical damage.
3-8-3-4-4 Installation Procedure
1. Connect the ECG to the ECG cable on the Vivid T9/Vivid T8
system.
Figure 3-11. Connect ECG to the system