EasyManua.ls Logo

Geco GH20SB - Scheme 5 - Circulation Pump and Heat Pump; Scheme 6 - DHW after Boiler Temp

Geco GH20SB
36 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
GH20SB – User Manual PAGE 29
6.5. Scheme 5 – the basic scheme with a circulation pump and a heat pump.
Output Device connected
O1 Collector pump P
O2 Heat pump K
O3 Circulation pump C
Sensor Description
T1 Collector sensor (Required)
T2 Tank sensor (Required)
T3 Sensor for calculating power/energy (Optional)
T4 Tank sensor (Required)
6.6. Scheme 6 – the basic scheme with a circulation pump, activating domestic hot water
heating after the boiler achieves the required temperature.
Output Device connected
O1 Collector pump P
O2 Boiler pump K
O3 Circulation pump C
Sensor Description
T1 Collector sensor (Required)
T2 Tank sensor (Required)
T3 Sensor for calculating power/energy (Optional)
T4 Tank sensor (Required)

Table of Contents

Related product manuals