EasyManua.ls Logo

Gehl RS5-34 - Page 107

Gehl RS5-34
292 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
RS5-34 Telescopic Handler TRANSMISSION
PRINTED IN U.S.A. 501-11 913241
Alt
=
to
hide
template
information
Alt+ to display template information
Template
Name:
OML
_
2
_
col
907871E
Template Date: 1997_02_12
STEP 50
G0905118
Position the right side transmission mounting bracket
(1) and install the mounting bolt (2) and the two bolts
(3) securing the bracket to the transmission.
STEP 51
G0905117
Install the two bolts securing the left side mounting
bracket to the transmission.
STEP 52
G0905127
Install the lower housing bell bolts.
STEP 53
Torque the housing bell bolts to 40 to 45 lb.-ft. (54 to
61 Nm).
STEP 54
G0905133
Install the flat washer (1) and lock nut (2) on the right
side mount bolt. Torque both center bolts to 285 to
320 lb.-ft. (385 to 435 Nm).
STEP 55
G0905099
Install and tighten the bolt (1) securing the chassis
ground cable (2) and the battery ground cable (3) to
the right side of the transmission.
1
2
3
3
1
2
2
3
1
View thousands of Crane Specifications on FreeCraneSpecs.com
View thousands of Crane Specifications on FreeCraneSpecs.com

Table of Contents

Related product manuals