EasyManua.ls Logo

Gehl RS5-34 - BOOM ASSEMBLY INSTALLATION

Gehl RS5-34
292 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
RS5-34 Telescopic Handler BOOM ASSEMBLY
PRINTED IN U.S.A. 701-6 913241
Template
Name:
OML
_
2
_
col
907871E
Template Date: 1997_02_12
Alt
=
to
hide
template
information
Alt+ to display template information
BOOM ASSEMBLY INSTALLATION
STEP 12
G1005032
Lower the boom assembly into position and install
the rear pivot shaft.
NOTE:
Ensure that the retainer bolt hole in the pivot
shaft is aligned with the retainer bolt hole in the
frame.
STEP 13
G1005030
Install and tighten the retainer bolt (1) and nut (2) in
the pivot pin.
STEP 14
Remove the caps and plugs from the hydraulic hoses
and fittings.
STEP 15
G1005027
Remove the hoist and lifting chain from the rear of
the boom.
STEP 16
G1005034
G1005033
Reconnect the four hydraulic hoses to the bulkhead.
1
2
View thousands of Crane Specifications on FreeCraneSpecs.com
View thousands of Crane Specifications on FreeCraneSpecs.com

Table of Contents

Related product manuals