EasyManua.ls Logo

Gehl RS5-34 - Fuse Power Tests

Gehl RS5-34
292 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
RS5-34 Telescopic Handler ELECTRICAL
PRINTED IN U.S.A. 301-11 913241
Alt
=
to
hide
template
information
Alt+ to display template information
Template
Name:
OML
_
2
_
col
907871E
Template Date: 1997_02_12
STEP 2
G0805146
Remove the positive (+) battery cable (1) from the
battery. Connect the multimeter negative (-) test lead
to the positive battery cable (1). Be sure the cable
end is not in contact with any metal surfaces.
Connect the positive (+) test lead to the positive (+)
post (2) of the battery. The multimeter should read 0
volts.
If there is voltage between the positive battery cable
(1) and the battery post (2), check the wiring for
shorts to ground.
If there is no voltage, recharge or replace the battery.
Install the positive (+) battery cable (1) on the battery.
FUSE POWER TESTS
STEP 3
G0805147
G0805151
Remove the four screws (1) and the fuse panel cover
(2). Connect the positive (+) test lead to the bottom
terminal of Fuse 1 to test for battery 12-volt power to
the fuse panel. The multimeter should read 12 to 13
volts.
If there is no voltage, replace the 60-amp in-line fuse
under the starter relay, or repair or replace th wires
between the battery and the fuse panel.
2
1
1
1
2
View thousands of Crane Specifications on FreeCraneSpecs.com
View thousands of Crane Specifications on FreeCraneSpecs.com

Table of Contents

Related product manuals