EasyManua.ls Logo

Gehl RS6-34 - Page 268

Gehl RS6-34
292 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
RS5-34 Telescopic Handler DOUBLE CHAIN REPLACEMENT
PRINTED IN U.S.A. 704-2 913241
Template
Name:
OML
_
2
_
col
907871
Template Date: 1994_04_22
Alt
=
to
hide
template
information
Alt+ to display template information
STEP 7
G1616MP
Remove the clevis pin from the chain.
STEP 8
Remove both chains.
STEP 9
G1618MP
Remove the adjustment clevis from the old chain by
removing one cotter pin and the retainer pin.
STEP 10
G1619MP
Install the adjustment clevis on to the new chain
using the retainer pin and one cotter pin.
STEP 11
G1616MP
Position the chain in the clevis at the rear of the inner
boom section. Install the retainer pin.
STEP 12
G1617MP
Install the cotter pin in the chain retainer pin.
STEP 13
G1005055
Lay the double chain on top of the inner boom
section and stretch along the length of the inner
boom section with the clevis ends hanging over the
front of the boom nose.
View thousands of Crane Specifications on FreeCraneSpecs.com
View thousands of Crane Specifications on FreeCraneSpecs.com

Table of Contents

Other manuals for Gehl RS6-34

Related product manuals