RS5-34 Telescopic Handler DOUBLE CHAIN REPLACEMENT
PRINTED IN U.S.A. 704-3 913241
Alt
=
to
hide
template
information
Alt+ to display template information
Template
Name:
OML
_
2
_
col
907871
Template Date: 1994_04_22
STEP 14
Reinstall the inner boom section into the intermediate
boom section. See Section 703 in this manual for
correct procedure.
STEP 15
Reinstall the extend cylinder forward pivot pin. See
Section 608 in this manual for correct procedure.
STEP 16
G1655MP
The inner boom section must be fully installed. Pull
the double chain assemblies up and over the
sheaves and place each clevis through the mounting
holes in the outer boom section, securing it with one
nut.
NOTE:
Check the condition of the sheave and roller
bearing at this time. Proceed to Step 22 if repair is
required.
STEP 17
Torque the double chains. See Section 702 in this
manual for correct procedure.
STEP 18
G1657MP
Install the lock nut on each clevis.
STEP 19
G0805199
Reinstall the cover (1) on the rear of the boom with
the four bolts (2).
STEP 20
Start the engine and check boom operation in a clear
area.
STEP 21
Shut down the engine and check for hydraulic fluid
leaks. Correct any leakage found.
2
1
View thousands of Crane Specifications on FreeCraneSpecs.com
View thousands of Crane Specifications on FreeCraneSpecs.com

Table of Contents

Other manuals for Gehl RS6-34

Related product manuals