EasyManua.ls Logo

Gehl RS6-34 - Installation Steps

Gehl RS6-34
292 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
RS5-34 Telescopic Handler SINGLE CHAIN REPLACEMENT
PRINTED IN U.S.A. 705-3 913241
Alt
=
to
hide
template
information
Alt+ to display template information
Template
Name:
OML
_
2
_
col
907871
Template Date: 1994_04_22
INSTALLATION
STEP 12
G1005059
Install the clevis block on the new chain using the
retainer pin and cotter pin.
STEP 13
G1619MP
Install the adjustment clevis on the new chain using
the retainer pin and cotter pin.
STEP 14
Attach the rope to the clevis block on the new chain.
Have an assistant (at the front of the boom) pull the
new chain in place with the rope while you guide the
chain into position.
STEP 15
G1005040
Position the single chain over the bearing and insert
the clevis end into the mounting hole at the rear of
the inner boom section. Install the first nut onto the
single chain clevis so that 2 inches (50.8 mm) of the
clevis is extending from the mounting bracket on the
inner boom.
STEP 16
G1607MP
Pull back on the single chain clevis to position the nut
between the two bars on the bracket. Check the
amount of clevis extending from the bracket, then
adjust to achieve dimension shown.
View thousands of Crane Specifications on FreeCraneSpecs.com
View thousands of Crane Specifications on FreeCraneSpecs.com

Table of Contents

Other manuals for Gehl RS6-34

Related product manuals