EasyManuals Logo

Genie DPL-25S Service Manual

Genie DPL-25S
104 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #14 background imageLoading...
Page #14 background image
Part No. 40462 DPL-25S • DPL-30S • DPL-35S Super Series 3 - 3
Section 3 - Scheduled Maintenance InspectionsSeptember 2016
Dealer
service
suggested
Tools are
required
New parts
required
MAINTENANCE TABLES
Table B
Complete all procedures in Table A
B-1 Inspect the Electrical Wiring
B-2 Inspect All Welds
B-3 Check the Lifting Chain Adjustments
B-4 Check the Battery - DC Models
B-5 Clean and Lubricate the Columns
B-6 Test the Lifting Capacity
B-7 Test the Power To Platform Operation
B-8 Adjust the Sequencing Cables
B-9 Inspect for Proper Outrigger Length

Table of Contents

Other manuals for Genie DPL-25S

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Genie DPL-25S and is the answer not in the manual?

Genie DPL-25S Specifications

General IconGeneral
BrandGenie
ModelDPL-25S
CategoryLifting Systems
LanguageEnglish

Related product manuals