EasyManua.ls Logo

Geotech PGT 900 - Chapter Three Installation And Use Methods; Installation

Default Icon
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
11
Chapter Three Installation And Use Methods
1Installation
Before sending, we did the debugging of the Main part . But before you operate it, you still need
some check and adjustment, to make it to the fullest use. Since you get the mini tiller, assemble it
as follows:
1. Fix the walking wheel to the Six squares opposite ends of the drive shaft respectively with φ8
pin
2. Assembly of trailer coupling: connect rod assembly in the trailer body, with the connecting pin
shaft connection and insert the cotter pin, then insert Subsoil resistance bar;
3. Installation of handle pipe: hand the tube opposition tube slots, adjust the height, use lock
handle and bolt fixed
4. Connect shift lever and fork shaft
We've done debugging before sending the products, before you use the power tiller, you'd better
check the parts and do some adjustment for better use.

Related product manuals