EasyManua.ls Logo

Gilbarco TRANSAC 12A - User Manual

Gilbarco TRANSAC 12A
33 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Loading...
Wilbcrrco
MDE 1598C
installation
and Service
Instructions
TRANSA;
12A
25JUL87
Question and Answer IconNeed help?

Do you have a question about the Gilbarco TRANSAC 12A and is the answer not in the manual?

Summary

SPECIFICATIONS

GENERAL DESCRIPTION

BASIC FEATURES OF THE TRANSAC 12 A SYSTEM

Provides an overview of the Transac 12A system's capabilities and operational functions.

DISPENSING UNITS

DISPENSING UNIT INSTALLATION INSTRUCTIONS

Details on how to install the dispensing units with the Transac 12A.

DUAL H-111 DISPENSER SETUP

Guidance on configuring dual H-111 dispensers for the Transac 12A system.

DISPENSER SWITCH AND STRAP CONFIGURATION

PUMP NUMBER SELECTOR SWITCH CONFIGURATION

Explains how to set the pump number selector switch for hose assignment.

GRADE SELECTOR SWITCHES CONFIGURATION

Details on setting grade selector switches for hose assignments.

LOGIC BOARD STRAP SETTINGS

Configures Logic Board settings like single/dual, decimal point, and volume unit.

LOGIC BOARD SWITCH AND STRAP OPTIONS

ROCKER SWITCHES FOR LOGIC BOARDS

Describes rocker switches replacing straps on later logic boards.

SWITCH FUNCTION TABLE DESCRIPTIONS

Explains functions of various switches and straps on the logic board.

LOGIC BOARD JUMPER CONFIGURATION

JUMPER GROUP JPC GRADE ASSIGNMENTS (A Side)

Configures grade assignments for the 'A' side using JPC jumpers.

JUMPER GROUP JPC GRADE ASSIGNMENTS (B Side)

Configures grade assignments for the 'B' side using JPC jumpers.

JUMPER GROUP JPD SETTINGS

Configures decimal point, volume unit, and single/dual options.

PUMP NUMBER JUMPER SETTINGS

Sets pump numbers for the 'A' and 'B' sides of the H-111B.

INSTALLATION INFORMATION

SITE CRITERIA

Specifies requirements for the installation site of the Transac System.

PREPARATION REQUIREMENTS

Outlines necessary steps before actual system installation.

UNPACKING EQUIPMENT

Instructions for inspecting and handling unpacked equipment.

CONDUIT REQUIREMENTS AND INSTALLATION INSTRUCTIONS

CONDUIT REQUIREMENTS

Specifies conduit requirements for dispensing units and wiring.

INSTALLATION INSTRUCTIONS

Provides step-by-step procedures for proper system installation.

INSTALLATION WIRING GUIDELINES

CONDUIT CONNECTIONS AND WIRE PULLING

Details on securing conduit connections and preventing wire damage.

WIRE CONNECTOR RECOMMENDATIONS

Guidance on using U/L listed wire connectors for secure connections.

FOUNDATION LAYOUTS AND POWER APPLICATION

Notes on using foundation layouts and when to apply power.

CABLING AND WIRING DRAWINGS

Refers to drawings for cabling and wiring connections.

INITIAL CHECK OUT

TESTING EQUIPMENT REQUIRED

Lists the necessary equipment for initial system checkout.

500 VDC MEGGER TEST OF INSULATION

Procedure for testing wire insulation resistance.

PHASING CHECK

Verifies hot wire phasing on the same transformer leg.

INITIAL START-UP

TRANSAC 12 A BATTERY INSTALLATION

Steps for installing the battery in the Transac 12A console.

TRANSAC 12 A OPERATIONAL CHECK-OUT

Procedures to verify operational status of each dispensing unit.

OPERATIONAL CHECK-OUT AND PURGING

PROGRAMMING GRADE 4 HOSES

Steps to program Grade 4 hoses for console assignment.

PURGING THE AIR FROM ALL DISPENSING UNITS

Procedure for purging air from all dispensing unit lines.

COMPLETE SYSTEM CHECKOUT

CONSOLE PROGRAMMING FOR CHECKOUT

Necessary console programming steps for system checkout.

SYSTEM CHECKOUT PROCEDURE

Step-by-step process to verify correct system operation for each hose.

SYSTEM CHECKOUT VERIFICATION AND TOTALS

VERIFYING PRESET AND DELIVERED AMOUNTS

Recording and comparing preset and delivered amounts for transactions.

TOTALS VERIFICATION (PUMP AND CONSOLE)

Verifying pump and console totals against expected values.

SERVICE INFORMATION

FUNCTIONAL DESCRIPTION

Explains the Transac 12A Highline 111 self-service system architecture.

BOARD BY BOARD ANALYSIS

Breakdown of the TRANSAC 12A's seven major component boards and their functions.

SERVICE INFORMATION AND TROUBLESHOOTING GUIDE INTRODUCTION

POWER SUPPLY MODULE DETAILS

Description of the power supply module and its functions.

PROCESSOR BOARD FUNCTIONS

Explains the role of the Processor Board in system communication and data handling.

DISPLAY BOARD FUNCTIONS

Details the circuitry for driving displays and indicator LEDs.

TROUBLESHOOTING GUIDE GENERAL INFORMATION

General advice on troubleshooting the T-12A H111 system.

TROUBLESHOOTING CAUTIONS AND PROCEDURES

GENERAL TROUBLESHOOTING CAUTIONS

Cautions to follow for a simple and error-free troubleshooting process.

TROUBLESHOOTING PROBLEM DETERMINATION

Steps to determine the exact malfunction and potential contributing factors.

FUSE INFORMATION AND TROUBLESHOOTING CHART

FUSE RATING AND LOCATION GUIDE

Chart detailing fuse ratings, locations, and affected components.

TROUBLESHOOTING CHART INSTRUCTIONS

Guidance on following the troubleshooting chart from beginning to end.

TROUBLESHOOTING SYMPTOMS AND ACTIONS

NO DISPLAY ON CONSOLE SYMPTOMS

Identifies symptoms related to no display and their corrective actions.

DISPLAY INCORRECT ON POWER SYMPTOMS

Addresses issues with incorrect display readouts and their solutions.

TROUBLESHOOTING OPERATIONAL ISSUES

INCORRECT OPERATION SYMPTOMS

Details problems with incorrect operation and possible causes.

CONSOLE MEMORY CLEARING PROCEDURE

Steps to completely clear the console memory if scrambled.

CONSOLE DIAGNOSTIC PROCEDURES

ENTERING DIAGNOSTIC MODE

Procedure to put the console into diagnostic mode.

KEYBOARD TEST CODES

List of keyboard keys and their corresponding diagnostic codes.

CONSOLE DIAGNOSTIC TESTS

PROCESSOR BOARD TESTS

Tests to check the functionality of the Processor Board.

DATA LOOP CHECKOUT

Procedures to verify field wiring and data loop operation.

DATA LOOP CONTINUITY AND DISPENSER RESPONSE

VERIFYING DATA LOOP CONTINUITY

Steps to check data loop continuity using switches and indicators.

DISPENSER RESPONSE VERIFICATION

Verifying that each dispenser responds to the console.

INTERNAL COMPONENTS OF THE TRANSAC 12 A CONSOLE

POWER SUPPLY AND BOARD LAYOUT

TRANSAC 12 A INTERCONNECT SCHEMATIC

DISPENSER WIRING SCHEMATIC

DUAL PRODUCT DISPENSER WIRING

Wiring diagram for dual one and two product dispensers.

WIRING NOTES AND GUIDELINES

Important notes and guidelines for dispenser wiring.

SELF CONTAINED PUMP WIRING SCHEMATIC

STANDALONE PUMP WIRING

Wiring diagram for H-111B standalone pumps.

CIRCUIT LOAD TABLE

Table showing circuit loads for dispensing unit components.

Gilbarco TRANSAC 12A Specifications

General IconGeneral
BrandGilbarco
ModelTRANSAC 12A
CategoryMusic Mixer
LanguageEnglish