Supplied By www.heating spares.co Tel. 0161 620 6677
16
220692C
16
SECTION
Flue Installation
5
Q
Q+13mm
STANDARD
FLUE TERMINAL
1m 2m FLUE
TERMINAL
Q
Q+11mm
2893
step
step
4
5
step
11
Continue at
Flue Duct (Standard
or Long)
Mark the duct to the length
“Q”+11mm then cut square and
remove any burrs.
Air Duct/Terminal
(Standard or Long)
Mark the duct to the length “Q”+13mm
then cut square and remove any burrs.
STANDARD, 1 METRE AND 2 METRE FLUE
TERMINAL KFB 70 ONLY.
1 METRE AND 2 METRE FLUE TERMINAL
KFB 60 ONLY