Supplied By www.heating spares.co Tel. 0161 620 6677
18
220692C
18
SECTION
Flue Installation
5
step
9
2895
step
10
S+11mm
S
S+13mm
WALLPLATE
/TEMPLATE
WALLPLATE
/TEMPLATE
Flue Duct
(Standard or Long)
Mark the duct to length “S”+11mm
then cut square and remove any burrs.
Terminal/Air Duct
(Standard or Long)
Mark the duct to the length “S”+13mm
then cut square and remove any burrs.
STANDARD
FLUE TERMINAL
KFB 60
S
STANDARD 1METRE AND 2 METRE FLUE
TERMINAL KFB 70 ONLY.
1 METRE AND 2 METRE FLUE TERMINAL
KFB 60 ONLY
1m 2m FLUE
TERMINAL