Supplied By www.heating spares.co Tel. 0161 620 6677
35
220692C
35
SECTION
8
Front Panel Assembly
9
2908
ADJUSTMENT
SCREW
SLIDE
ASSEMBLY
CATCH
step
4
step
5
Locate the front panel assembly.
Engage the bottom front panel
assembly slide/catch and adjust as
necessary.
Instruct and demonstrate the efficient and safe
operation of the boiler, heating system and if fitted, the
domestic hot water system.
Advise the user of the precautions necessary to prevent
damage to the system and building in the event of the
heating system being out of use during frost and
freezing conditions.
Advise the user, to ensure the continued efficient and
safe operation of the boiler it is recommended that it is
checked and serviced as necessary at regular intervals.
The frequency of servicing will depend upon the
particular installation conditions and usage, but in
general once a year should be enough.
It is the law that servicing must be carried out by a
competent person.
Draw attention, if applicable, to the current issue of the
Gas Safety (Installation and Use) Regulations, Section
35, which imposes a duty of care on all persons who
let out any property containing a gas appliance.
Reminder, leave these instructions with the user.
User Information
User Information
SECTION