EasyManua.ls Logo

Goldstain FRG-1 User Manual

Goldstain FRG-1
26 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
GAS FRYERS
PROUDLY AUSTRALIAN MADE
INSTALLATION PROCEDURE – USER MANUAL
SERVICE INSTRUCTION
MODELS FRG-1,2,3 – FRG-24,48,72
GAS APPROVAL NO. 2149/SC333
ESTABLISHED 1911
The Cooking Equipment Professionals
www.goldsteineswood.com.au
Question and Answer IconNeed help?

Do you have a question about the Goldstain FRG-1 and is the answer not in the manual?

Goldstain FRG-1 Specifications

General IconGeneral
BrandGoldstain
ModelFRG-1
CategoryFryer
LanguageEnglish

Summary

1. Introduction

Model Introduction

General description of Goldstein Deep Well Gas Restaurant Fryer models.

Oil Temperature Management

Guidelines for maintaining optimal oil temperature for cooking and oil longevity.

2. Installation

Receiving and Pre-Installation Inspection

Procedures for checking fryer for damage and missing parts upon receipt.

Pre-Installation Site Checks

Checks for clearance, rating plate suitability, and fire hazards before installation.

Gas Regulator and Supply Information

Information on the integrated regulator and external connection requirements.

Fryer Leg Assembly

Instructions for attaching the fryer legs.

Ventilation Requirements

Requirements for adequate ventilation and exhaust systems for the fryer.

Installation Responsibilities and Notes

Appliance must be installed by authorized personnel following local regulations.

Unit Positioning and Clearance

Positioning the fryer and ensuring minimum distance from combustible walls.

Fryer Levelling Procedure

Procedure for levelling the fryer using a spirit level for optimal performance.

Mains Gas Connection

Connecting the appliance to the mains gas supply by a qualified professional.

Critical Operation Safety Warnings

Critical warnings regarding operating the fryer with no oil or incorrect oil levels.

Warranty Card Reminder

Reminder to return the warranty card to avoid voiding the warranty.

3. Commissioning

Commissioning Checklist

Step-by-step checklist for appliance commissioning and testing.

Gas Pressure Adjustment

Adjusting gas pressure for Natural Gas and LPG based on unit operation.

Customer Operational Demonstration

Showing the customer how to operate, clean, and maintain the equipment.

Manuals and Warranty Card Check

Ensuring manuals and warranty cards are present and reviewing with customer.

Hose Usage Warranty Warning

Warning against using wash hoses as it will void the warranty.

4. Operating Instructions

Pre-Use Cleaning and Filling

Cleaning new fryer parts and filling with oil before initial operation.

Daily Operation Checks

Daily checks at opening time, including gas valve status.

General Fryer Usage Guidelines

Advice on using frying compound, solid shortening, and temperature settings.

Oil Filtering and Management

Procedure and importance of filtering frying compound daily for quality and life.

Closing and Shut Down Procedures

Steps for closing the fryer at night and for extended shutdowns.

General Cleaning and Maintenance

General principles for maintaining equipment cleanliness and performance.

Daily Cleaning Tasks

Daily tasks including washing parts, cleaning surfaces, and filtering oil.

Weekly Frypot Cleaning

Weekly procedures for draining, cleaning the vessel, and boiling out residue.

Stainless Steel Care and Warnings

Guidelines for cleaning stainless steel and warnings about abrasive materials.

Aerosol Use Prohibited

Caution against spraying aerosols near the appliance during operation.

5. Lighting Instructions

Lighting, Relighting, and Shutdown

Detailed instructions for lighting, relighting, and shutting down the fryer.

Over Temperature Safety Control

Explanation of the safety control preventing overheating above 235°C.

Straining Excess Crumbs

Procedure for straining crumbs while the cooking medium is warm and liquid.

Pilot Ignition Note

Note on potential slow pilot ignition due to air trapped in manifold system.

6. Draining & Filtering Instruction

Safe Draining Procedure

Detailed instructions and warnings for safely draining hot shortening.

Protective Clothing Requirement

Mandatory use of protective clothing when handling hot liquids.

Clearing Clogged Drain Valve

Using a poker tool to clear food particles from the drain valve, avoiding damage.

Shortening Cooling and Transport

Allowing drained shortening to cool to 38°C or lower before handling.

Fry Pot Cleaning Post-Draining

Cleaning food particles and residual shortening from the fry pot before refilling.

Refilling with Filtered Shortening

Refilling the fry pot with clean, filtered shortening after draining and cleaning.

Gas Odour Detection Protocol

Procedure for handling gas odours: shut off supply and contact services.

Boiling Out New Frypots

Procedure for cleaning new fry pots using a boil-out solution before filling.

Water Droplet Warning Before Filling

Crucial warning to remove all water droplets before filling with shortening.

Filling with Solid Shortening

Instructions for filling the fryer with shortening, including melting solid shortening.

7. Technical Data

Gas and Injector Specifications

Table detailing gas types, injector sizes, and pressure ratings.

Fryer Dimensions Table

Table showing width, depth, and height dimensions for various fryer models.

Natural Gas to LPG Conversion

Step-by-step guide for converting the fryer from Natural Gas to LPG.

8. Servicing

Accessing Fryer for Servicing

Procedure for safely accessing the fryer for maintenance and servicing.

Short Period Shutdown Procedure

Instructions for turning off the fryer for short periods, setting to pilot.

Closing Store Shutdown Procedure

Procedure for shutting down the fryer completely when closing the store.

Ventilation and Clearance Importance

Importance of proper ventilation and clearance for efficient fryer operation.

Recommended Spare Parts Inventory

List of recommended spare parts to keep in stock for minimum downtime.

Parts Ordering and Service Contact

Guidance on contacting the factory for service issues and ordering parts.

Specification Amendment Policy

Statement regarding the company's right to amend specifications without prior notice.

9. Trouble Shooting

General Troubleshooting Guidelines

General guidelines for troubleshooting, requiring authorized personnel.

Warranty Work Approval

Requirement for factory approval before performing any warranty work.

Pilot Burner Malfunctions

Common issues with pilot burner ignition and staying lit, with solutions.

Unstable Pilot Flame Issues

Troubleshooting unstable pilot flames, wavering, and thermocouple coverage.

Main Burner Operation Problems

Problems with main burner not igniting or having lazy flames.

Excessive Temperature Symptoms

Diagnosing issues causing excessive temperature, scorching, and discoloration.

Fryer Temperature Not Reaching

Troubleshooting why the fryer fails to reach temperature or runs erratically.

Uncontrolled Fryer Temperature

Resolving issues where fryer temperature cannot be controlled or runs too high.

Pilot Not Staying Lit

Diagnosing why the pilot will not stay lit, including oil level and thermostat reset.

10. Wiring Diagram

White Rodgers Control Wiring

Wiring diagram for the White Rodgers control system.

11. Controls

Control Panel Components

Overview of the fryer's control panel, including thermostat and sparker.

Lighting and Shutdown Procedures

Instructions for lighting, relighting, and shutting down the fryer.

12. Drawing

Dimensional Drawings FRG24/FRG2L

Front and side view dimensional drawings for FRG24 and FRG2L models.

Exploded Parts Drawings

Exploded view drawings showing various parts and model variations.

13. Spare Parts

Spare Parts List - FRG-1, FRG-1L

Comprehensive list of spare parts with item number, code, and description.

Additional Spare Parts Listing

Continued listing of spare parts for FRG-1 and FRG-1L models.

14. Warranty

Warranty Terms and Conditions

Details of warranty coverage, exclusions, and limitations.

Warranty Labour and Hours

Information on labour charges and working hours covered under warranty.

Liability Limitations

Statement limiting liability for damages or loss related to the product.

15. Goldstein/ESWOOD Branches

Head Office Contact Information

Contact information for the main head office.

State Branch Contact Details

Contact details for Victoria, Queensland, South Australia, and Western Australia branches.