EasyManua.ls Logo

GÖLZ KB 300 - Fixing with Dowels; Fixing with Vacuum Hold down

GÖLZ KB 300
82 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
KB300 / KB350 with FS560
Translation of the original operating instruction and spare parts list
- 26-
5006892-01
BA-E
®
Note: Vacuum is built up faster and safer if the pipe-surface is wetted with water before
attaching a pad.
4.3.4 Fixing with dowels
Set up of the machine on walls or flat surfaces one can choose two ways: Dowel plates or dowel base.
Dowel plates are attached with bolts to the pipe base.
Drill dowel holes, mount the dowel and set up the machine with bolts into the dowels. Please follow the
instructions of the dowel-producer!
Use screws with a minimum length of 140 mm (51/2") when using dowel plates.
Dowel base is consisting of 2 L-formed plates. The dowel base is attached into the holes of the pipe base,
so first the pipe-base has to be removed and then the two dowel base-plates are mounted instead of the
pipe base.
4.3.5 Fixing with vacuum hold down
Remove the ground frame and place the machine with the pipe base onto the pipe.
Attach the vacuum pads to the left and to the right of the pipe-frame, but do not tighten the bolts yet!
Start the vacuum pump and wait until gauge on vacuum pump shows a minimum of 0,7 bar (10 PSi).
Connect one male coupler of the vacuum system to one of the vacuum pads and wait until vacuum is built-
up.
Repeat this operation to the second vacuum pad. Tighten all the bolts that connect the pads to pipe frame.
Fixing with dowel plates
Fixing with dowel base
Note: Read and observe the operating instructions to the vacuum suction plates!

Table of Contents

Related product manuals