EasyManua.ls Logo

Goodman GMEC961205DNAB - Vent;Flue Pipe Lengths (Non-Direct Vent) and Diameters

Goodman GMEC961205DNAB
64 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
SYSTEM OPERATION
16


NON-DIRECT VENT
VENT/FLUE TERMINATION
NO TERMINATIONS
ABOVE WALKWAY

4'
4'
NON-DIRECT VENT
VENT/FLUE TERMINATION
DIRECT VENT
VENT/FLUE TERMINATION



FORCED AIR
INLET
OTHER THAN
COMBUSTION AIR
TERMINATION INTAKE
GRADE OR HIGHEST
ANTICIPATED
SNOW LEVEL


T
 RBBR B  T G T RT 
 T
RBBR B  T XTR T T R BT
XTR R T B TK T QT RT 
T G  G  RT  K G B
JR R T  T XR T  G G RB
X

Refer to the following tables for applicable length, elbows, and


single 90° elbow must be secured to the combustion air intake
to prevent inadvertent blockage. The tee or elbows used in

the number of elbows in the piping system.
1 2 3 4 5 6 7 8
2 75 71 67 63 60 56 52 48
3 126 120 115 110 105 99 94 89
2 37 33 30 26 22 18 15 11
3 107 102 96 91 86 81 75 70
2 100 95 90 85 80 75 70 65
3 168 161 154 147 140 133 126 119
2 50 45 40 35 30 25 20 15
3 143 136 129 122 115 108 101 94
2 60 55 50
45 40 35 30 25
3 113 106 99
92 85 78 71 64
2 60 55 50 45 40 35 30 25
3 120 113 106 99 92 85 78 71
2 45 40 35 30 25 20 15 10
3 103 96 89 82 75 68 61 54
2 45 40 35 30 25 20 15 10
3 151 144 137 130 123
116
109 102
*M EC961205DN
3 185 178 171 164 157 150 143 136
2 100 95 90 85 80 75
70 65
3 110 103 96 89 82 75 68 61
2 45 40 35 30 25 20 15 10
3
110 103 96 89 82 75 68 61
2 35 30 25 20 15 10 5 NA
3 103 96 89 82 75 68 61 54
2 45
40 35 30 25 20 15 10
3 110 103 96 89 82 75 68 61
*CEC960603BN
*CEC960803BN
*CEC961005CN
2.5" pipe may be used instead of 2" pipe.
For installations at or above 7,000 altitude use 3" venting (and combustion
*M EC960603BN^
*M EC960803BN
*M EC960804CN
*M EC961004CN
*M EC961005CN
*CEC960403BN
*M EC96/*CEC96 Direct Vent (2 - Pipe) and Non-Direct Vent (1- Pipe)
(6)
Maximum Allowable Length of Vent/Flue Pipe
M ODEL
Pipe Size
(4)
(in.)
Number of Elbows
(3) (5)
*M EC960302BN
&
*M EC960402BN
*M EC960303AN
&
*M EC960403AN
*M EC960603AN^
 
 
 
in the piping system.
4) 2 1/2” or 3” diameter pipe can be used in place of 2” diameter pipe.
 
equivalent to one 90 deg. elbow.
6) One 90° elbow should be secured to the combustion air intake connection.














Table of Contents

Related product manuals