EasyManua.ls Logo

Goodman GMVC96 BA Series - Servicing and Diagnostics; Electrical Checks: Phasing, Voltage, and Wiring

Goodman GMVC96 BA Series
65 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
SERVICING
42


polarization of incoming power. Some also require phasing
between the primary and secondary sides of step-down
transformers.
120.00
0.00
GND
GND
THIS IS L1 OR THE
HOT POWER LEG
THIS IS THE COMMON
OR NEUTRAL LEG
INCOMING POWER

TRANSFORMER
.
SECONDARY
PRIMARY
.
GND
C
R
LINE VOLTAGE
L1 (HOT)
LINE VOLTAGE
(NEUTRAL)
METER READS
24 VOLTS
METER READS
120 VOLTS
.
GND
C
R
N
L1
.
GND
C
R
N
L1
READS 96 VOLTS - IN PHASE
READS 144 VOLTS - OUT OF PHASE
.
If meter reads approximately 96 volts - the primary to secondary are in phase - if reads approximately 144 volts out of phase
- reverse low voltage wires.
C
R
GND





These then should be wired to the furnace accordingly.
Some transformers will display phasing symbols as shown
in the illustration to the left to assist in determining proper
transformer phasing.

Related product manuals