EasyManua.ls Logo

goodnature AA-375R User Manual

Default Icon
27 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
1
Flash Pasteurizer
All Models
OWNER’S MANUAL
Serial # ____________

Questions and Answers:

goodnature AA-375R Specifications

General IconGeneral
CO2 Canister Size16g
Target SpeciesRats
Kill Count per Canister24
MaterialsStainless steel, plastic
Reset MechanismSelf-resetting
Operating Temperature Range-10°C to 50°C

Summary

SECTION 1: Safety Precautions

1-1 Safety Precautions

Lists safety rules: wear safety glasses, avoid loose clothing, use hair nets, no foreign items, disconnect power.

SECTION 2: Unpacking

2-1 Unpacking

Details on unpacking equipment, inspection for damage, and locating the pasteurizer in a suitable area.

SECTION 3: Installation

3-1 Installation

Covers electrical connections, component attachment, pump feed, product outlets, boiler filling, and cooling systems.

SECTION 4: Operation

4-1. Operation

Covers general operation, HTST and hot-fill setup procedures, flow rates, and startup guidelines.

4-2. Adjusting Pump Speed - AC Tech Drive

Detailed instructions for adjusting pump speed settings using the AC Tech Drive, including parameter navigation.

4-3. Adjusting Boiler Temperature

How to adjust boiler temperature using single and two-stage controllers, including programming and setpoint adjustments.

4-4. Pressure Differential System

Details on the pressure differential system, its components, and adjustment procedures for maintaining pressure balance.

4-5. Chart Recorder Programming

Guide to programming the chart recorder, covering mode selection, key functions, and parameter settings.

4-6. Thermometer Calibration

Steps for calibrating the thermometer using a master thermometer and adjusting its physical orientation.

SECTION 5: Cleaning

5-1. Machine Cleaning

Proper cleaning procedures, recommended detergents, cautions, and water volumes for different machine types.

SECTION 6: Maintenance

6-1. Routine Maintenance

Key routine maintenance tasks: disconnect power, wear safety glasses, keep clean, check fasteners, and inspect wiring.

SECTION 7: Useful Information

7-1. Replacement Parts List

A list of commonly replaced parts, including gaskets, recorder charts, and pens, with corresponding part numbers.

7-2. Reference

Program settings for the boiler's stage controller, including setpoint, delay, and differential ranges and actual settings.

7-3. Troubleshooting

Troubleshooting common issues for the boiler, such as not firing, low water flow, and temperature regulation problems.