EasyManua.ls Logo

Gossen MetraWatt ECUTEST ST BASE - Page 28

Gossen MetraWatt ECUTEST ST BASE
56 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
SECUTEST ST BASE(10) / PRO and SECULIFE ST BASE(25)
28 Gossen Metrawatt GmbH
13.4 RINS – Insulation Resistance Measure-
ment for Protection Category I DUTs
U+/U– = increase/decrease UINS(set)
1
Connection also via EL1, VL2E, AT3-IIIE, AT3-IIS,
AT3-II S32, AT16DI/AT32DI or CEE adapter
Special Case: Inputs for Applied Parts
Connect the DUT to the test socket.
Contact the short-circuited inputs for the
applied parts with test probe P1.
Meas. Parameter Meaning
Measurement type
LN(TS) PE(TS) PC I: Testing is conducted be-
tween short-circuited LN mains
terminals at the test socket and
the DUT’s PE terminal.
1
LN(TS) P1 See section 13.5
P1 – P2
Only test instruments with feature H01:
2-pole measurement between test
probes P1 and P2 (see section 13.17)
PE(mains) P1
Permanently connected
DUTs
Cable test: Testing is conducted be-
tween the ground terminal at the
mains and test probe P1.
PE(TS) P1
Testing is conducted between the
PE terminal at the test socket and
test probe P1.
LN(TS) P1//PE(TS)
Testing is conducted between short-
circuited LN mains terminals at the
test socket and test probe P1, in-
cluding PE at the test socket.
UISO(set) U+/U–
> 50 ... < 500 V Variable test voltage can be en-
tered with the numeric keypad
Select measuring function
1
RINS
Select parameters
2
Set parameters
3
Connect the DUT
4
LN(TS)-PE(TS)
LN(TS)-PE(TS)
P1
Start test
5
Save measured values to clipboard
6
Stop test
7
Save measurements under ID no.
8

Table of Contents

Related product manuals