XCU UXF Fiber Series XF Transmission Fiber Base Station User’s Guide (v1.3) 17
Chapter 2 - Installation
2.1.4 Connecting studio cabling
The studio cabling (Media Network, baseband video, control and intercom, studio signalling)
can now be connected according to your application and studio configuration. Refer to “Power
and Transmission” on page 88 for connectors and signals available on the cradle.
2.2 Mounting the XCU
To mount the XCU into the cradle, proceed as follows:
• Place the XCU onto the sliding rails of the cradle, slide the unit into the cradle and push
firmly.
• Push down the right and left locking handles until they snap down.
To remove the XCU from the cradle, proceed as follows:
• Hold down the springs inside the locking handles and at the same time swing them open.
• Pull out the XCU from the cradle by pulling the XCU at its sides.
• Now the transmission and mains cables can be connected. Refer to “Connector back
panel” on page 87 for connectors and signals available on the XCU.