EasyManua.ls Logo

GRE KOV4870NE - Page 11

GRE KOV4870NE
70 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
INSTALL THE POOL DIRECTLY ON THE GROUND
We recommend you assemble the pool between two or three persons and on a wind-free day. The use of gloves for the
installation is recommended for safety. THE ENTIRE PROCESS SHOULD BE CARRIED OUT ON FIRM AND LEVEL
GROUND, BEFORE EXCAVATING THE FOUNDATION
EXCAVATION OF THE FOUNDATION (Z) FOR THE COLUMNS (C):
Dimension of the foundation:
Z =430x15x15cm
Z =380x15x15cm
IMPORTANT: When excavating the foundation, the rectangular space reserved for situating the AP that should be buried
5 cm and transversally fixed with their respective PG should be excavated(*). All the structural system should be perfectly
levelled (columns and internal structure, beams).
15cm
15cm
Foundation
Columns
Z
Z
C
1111111111
EN

Related product manuals