EasyManua.ls Logo

Gree GRH120DA-K3NA1A - Step 5: Completing Installation

Gree GRH120DA-K3NA1A
74 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Make sure the guide louver and the filters are properly positioned in the ceiling grille.
2.
Secure the ceiling grille to the ceiling assembly frame with 4 screws. (see Figure 10).
3.
Switch on the power supply and check the unit work or not.
5.
Install screw caps into four screw holes.
4.
Check the thermostat position. Make sure the thermostat is routed through the holding guide
and is not touching any metal surface.
1.
STEP 5-COMPLETING THE INSTALLATION
To complete the installation and system checkout requirements, the following steps must be
performed.
Frame
Ceiling Grille
4 Screws and 4 Screw cap
Figure 10
- 21 -
Copyright 2018. This translation is property of GREE PRODUCTS SL. All rights reserved. Total or partial reproduction without its express authorization is prohibited.

Related product manuals