AIR-TO-WATER HEAT PUMP INSTALLATION
73
SXVD200LCJ/A-K SXVD200LCJ2/A-K SXVD300LCJ/A-K SXVD300LCJ2/A-K
SXVD200LCJ/A-M SXVD200LCJ2/A-M SXVD300LCJ/A-M SXVD300LCJ2/A-M
Litre
200L 200L 300L 300L
coil
specification
SUS304 Ф22X0.8
M
\ 10m \ 10m
coil
length
N
13m 13m 18.5m 18.5m
D(mm)
540 620
D1(mm)
438 528
H(mm)
1595 1620
A(mm)
272 280
B(mm)
105
C(mm)
112
E(mm)
432 464
F(mm)
431 399
I(mm)
\ 80 \ 95
J(mm)
\ 247.5 \ 202.5
K(mm)
739 718
Outline
(Diameter×H)
(mm)
Φ540X1595 Φ620X1620
Package
(W*D*H)
(mm)
1620X625X630 1645X705X710
Net
weight
kg 68 71 82 87
Gross
weight
kg 77 80 92 97
Connection of Waterway System
If connection between water tank and indoor unit should be through the wall, drill a
holeφ70 for pass of circulating water pipe. It is unnecessary if the hole is not needed.
Preparation of pipelines: Circulating water outlet/inlet pipe must be hot water pipe,
PPR pipe with nominal out diameter of dn25 and S2.5 series (wall thickness of 4.2mm)
being recommended. Cooling water inlet pipe and hot water outlet pipe of water tank
should also be hot water pipe, PPR pipe with nominal out diameter of dn20 and S2.5
series (wall thickness of 3.4mm) being recommended. If other insulated pipes are
adopted, refer to the above dimensions for out diameter and wall thickness.
Installation of circulating water inlet/outlet pipes: Connect the water inlet of unit
with circulating outlet of water tank and water outlet of unit with circulating inlet of
water tank.
Installation of water inlet/outlet pipes of water tank: Safety check valve (→ on the
valve body points at water tank), filter and cut-off valve must be installed for water
inlet pipe according to the installation sketch of unit. At least a cut-off valve is needed
for the water outlet pipe.
Installation of blow-off pipe at the bottom of water tank: Connect a piece of PPR
pipe with drainage outlet to floor drain. A cut-off valve must be installed in the middle
of the drainage pipe and at the place where it is easy to be operated by the users.