EasyManua.ls Logo

GROUND FORCE 717H01 - Page 6

Default Icon
57 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
WWW.GFWORLDWIDE.COM | +1 (208) 664-9291
Pump mounting plate upgraded to heavy-duty stainless
steel
Stainless steel water pump upgrade (B4)
4" STAINLESS STEEL GRAVITY DUMP BAR
• Width of tank, at rear
4" schedule 40 pipe with 3/4" holes on 6" centers
• Operated from cab
HYDRAULIC OPERATED SIDE SPRAY
Side spray (2) located at upper quadrants - front of tank
(2) HYDRAULIC REWIND HOSE REELS
(2) water hose reel with 100' x 1-1/2" hose and adjust-
able nozzle
• Mounted on the rear of the machine
• Includes manual in-line shut-off (isolator) valve
Includes addition of high idle switch box
Air blow-down and control valve for hose draining
NITRO WATER CANNON
Hard-wired joystick control operation
500 GPM adjustable nozzle
Includes automatic drain feature to eliminate standing
water in Monitor pipe
(2) 24V LED UTILITY LIGHTS (USES BACKUP
LIGHTS WITH DEDICATED SWITCH)
(2) 24V LED rear-mounted sealed-beam work lights
Include control switch/circuit protection in tractor cab
TYRI 1313 or similar 7,000 Lumens
WATER LEVEL INDICATOR ELECTRIC
• In-cab water level indicator
AUTOMATED GREASING SYSTEM
Groenwald Beka Twin 3.1 Automated Greasing System
with 8-liter pump, in-cab display, and auxiliary grease
points on Cat 631K water pull with 34 grease points
Optional add-on, Groenwald Twin 3.1 24V , 8L auto-
mated grease pump F605338
Optional add-on Groenwald Twin system parts kit (large)
F198737
INTERIOR COATING
Interior coating per spec provided by Skip Vernon CLT Inc
NW Sandblast & Paint to sandblast the 12,000-gallon
tank interior to the product preparation specication
• Sandblast the interior of the tank to an SSPC-SP10 near
white metal
Apply two coats of PPG Amerlock 2 Epoxy @ manufac-
turer’s recommendation of 4-8 mils dft per coat
Apply caulking on all skip welds prior to applying the
second coat of epoxy (no additional cost)
• Have hold points for outside inspection QA after blast,
each coat of epoxy and caulking
6
SPECIFICATIONS