4. Testing installation
4.1 Testing installation procedure
After completing all the connections the cabinet operation should be checked.
Do not add media at this stage
Do not open the air supply at this stage
Switch on main electrical power supply
Switch on cabinet light
Start the dust collector:
o The direction of the impellor motor should be checked visually against the arrow on
the motor. If rotation is in the wrong direction, then on a 3 phase motor two of the
input phase lines should be changed over. Guyson International should be contacted
for more info if it is a single phase motor.
NOTE: Air will flow from the outlet even if the fan rotation is wrong, but only at a low
level, so rotation must be checked visually.
The best way to do this task is by starting then stopping the dust collector and watch
the fan as it slows down.
On a 41 dust collector the motor is inside. The
front cover must be removed to see the top of
the motor.
On a C400 dust collector the motor is on the
outside and can be easily checked.