Operation &
Maintenance
Manual
A6ML0066 – Euroblast SF Instruction Manual
Set pressure regulator to required blast pressure
Check all in-line connections for leaks and possible blockages
Insert both arms through the armhole entries
Depress the foot pedal
Check for steady air blast from blast nozzle and for possible leaks
Release foot pedal and remove arms from entries
Add media to machine