Operation &
Maintenance
Manual
Issue:
10
A6ML0066 Euroblast SF Instruction Manual
Date:
05/2019
Page: 27
6. Operation
6.1 Operating procedure
Perform daily maintenance tasks (see section 7.1)
Switch on main electrical power supply
Switch on cabinet light
Start the dust collector
Start the cyclone
Turn on the air supply by opening the main air valve
Ensure any component is grease-free and dry before blasting
Open the cabinet door
Place component in cabinet
Position the blast gun and airwash so that they will be easily reached when using the
gauntlets/gloves and sleeves
Close the cabinet door securely
Insert both arms through the armhole entries
GAUNTLETS/GLOVES MUST BE USED IN CONJUNCTION WITH THE
ARMHOLE SLEEVES
Depress the foot pedal, media will exit from the gun nozzle
Move the nozzle jet across the component surface at a suitable distance, refer to blast nozzle
settings section
The component should be blasted evenly
When the blasting is complete, release the foot pedal
The door can now be opened, and the component can be removed for inspection
Further blasting may be necessary, or an adjustment to one or more of the machine or blast
settings
The air line may be used to clean dust from the component surface