1. Make sure all load units are turned off.
2. Make sure the DUT is turned off.
3. Connect the load units to the DUT.
Ensure the wire gauge is sufficient to handle
the increase in current
4. Connect the Master unit to the slave units via
the J1/J2 connectors*.
Use the GTL-255 frame link cables
Connect from:
Master J2 Slave1 J1
Slave1 J2 Slave2 J1 and so on.
Remove one ferrite core from the last frame link
cable. Remove the ferrite core that is closest to
the J1 connector on the last slave unit. See the
diagram below for details.
5. Turn the load units on.
6. On the designated master unit, press
>
Configure [F5] > Next Menu [F4] > Parallel[F1].
7. Set the unit to Master with the Operation
setting.
8. Assign the number of attached slave units or
booster units with the Parallel and Booster
settings.
A maximum of 5 units can be used in parallel.
A maximum of 4 boosters can be used with a
single PEL-3111(H), acting as a master unit.