EasyManua.ls Logo

GW Instek PSW 30-72 - Run Test Script (Automatically at Startup)

GW Instek PSW 30-72
187 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
PSW Series User Manual
94
Run Test Script (Automatically at Startup)
Overview
The power supply can be configured to
automatically run a test script at startup.
Steps
1. Before a test script can be run, it
must first be loaded into one of the
10 memory save slots.
Page 90
2. Turn the unit off.
3. Enter the power-on configuration
settings and set F-92 (Power-ON
Output) to run the desired test
script.
Page 117
Range
T001~T010*
4. The selected test script will automatically start
to run the next time the unit is powered on.
Note
*Setting F-92 to 0 or 1 will disable loading a test
script at startup. 0 will turn the output off at
startup. 1 will turn the output on at startup. See
the power on configuration settings for details,
page 113.
Note
When a script is running, press the Output key to
pause the script. To resume the script, press the
Output key again.
www.GlobalTestSupply.com
Find Quality Products Online at: sales@GlobalTestSupply.com

Table of Contents

Other manuals for GW Instek PSW 30-72

Related product manuals