WGM - 28 November 2007 - Edition 01
PAT700 Total Organic Carbon Analyzer – Installation Page 11
Anatel Operator Manual
Figure 2-2 PAT700 analyzer orientation
Mounting general considerations
Follow these guidelines when installing the analyzer:
• Locate the analyzer where it is accessible for operation, service and calibration.
• Minimize the distance between the water system sample point and the analyzer to
allow for representative sampling.
• Maintain sufficient space to allow access to the power switch, and the plumbing and
electrical connections on the end panels.
• Locate the analyzer where the ambient temperature remains from 10 to 40 °C
(50to104 °F).
• The mounting bracket is installed independently from the analyzer. Once mounted, the
analyzer hooks on the mounting bracket and locks into place with twist latches.
• Mount the mounting bracket to a stable, flat surface or dual instrument poles.
• The front of the analyzer requires 12 inches (30.48 cm) of clearance to allow the doors
to open completely.
• The analyzer is available with ¾-inch conduit openings or quick-connect fittings for
power and I/O wiring. If conduit is used, install fittings that ensure a complete seal with
the openings and are properly sealed to keep the analyzer electronics compartment
watertight.
[228.6]
9
[597]
23.5
Dimensions in
[mm]
in.
UP