WGM - 28 November 2007 - Edition 01
PAT700 Total Organic Carbon Analyzer – Installation Page 13
Anatel Operator Manual
Use four 5/16-inch U-bolts, two for each 2-inch pipe, and eight matching nuts, to mount
the analyzer mounting bracket to two rigid instrument poles. Use U-bolts and nuts that
can withstand the process environment. Hach Ultra does not supply U-bolts or nuts.
The U-bolts and nuts should not extend more then 0.60 inches (15 mm) from the inside
of the mounting bracket to allow clearance for the mounting hardware.
Figure 2-4 PAT700 instrument-pole mount