EasyManua.ls Logo

Haier 1U12LC2VHA - Page 9

Haier 1U12LC2VHA
42 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
INSTALLATION
PAGE 9
ENGLISH SECTION A
Step 3.3 Step 3.4A
Step 3.5A
Step 3.6
Step 3.4B
Step 3.5B
3.3
Step - 3.3
Remove the adapter and hose connection from the suction
line port, and replace the cap.
3.4
Step - 3.4A & 3.4B
Remove the cap from the liquid line valve. Using the hex
wrench, open the valve, then replace and tighten the cap.
Illustration 6
It becomes
high midway.
Thegap with the
ground is too small
Thereisthe bad
smellfrom a sewer
It waves.
Theend is imm-
ersed in water.
Lessthan
5cm
3.5
Step - 3.5A & 3.5B
Remove the cap from the suction line valve. Using the hex
wrench, open the valve, then replace and tighten the cap.
3.6
Step - 3.6
Wrap the lineset, drain line, and wiring starting at the bottom
of the bundle with an overlap type wrap, concluding at the
piping hole. Use a sealant to seal the piping hole opening
to prevent weather elements from entering the building.
(Illustration 6)
Verify the condensate drain line has a constant pitch
downward for proper water ow. There should be no kinks
or rises in the tubing which may cause a trapping eect
resulting in the failure of the condensate to exit the piping.

Related product manuals