EasyManua.ls Logo

Haier AB18CS1ERA - Page 337

Haier AB18CS1ERA
448 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Outdoor Unit
335
Super Match
8. Cutting and Flaring work of piping
Pipe cutting is carried out with a pipe cutter and burs must be removed.
After inserting the are nut, aring work is carried out.
Pipe Pipe diameter Size A (mm)
Liquid side 6.35mm(1/4") 0.8~1.5
Gas side
9.52mm(3/8") 1.0~1.5
12.7mm(1/2") 1.0~1.5
9. On drainage
Please install the drain hose so as to be downward slope without fail. Please don't do the drainage as shown below.
3) Use separate thermal insulation pipes for gas and liquid refrigerant pipe
Please pour water in the drain pan of the indoor unit, and conrm that drainage is carried out serely to outdoor.
In case that the attached drain hose is in a room, please apply heat insulation to it without fail.
WARNING
1) Do not use mineral oil on ared part.
2) Prevent mineral oil from getting into the system as this would educe the lifetime of the units.
3) Never use piping which has been used for previous installations. Only use parts which are delivered with the unit.
4) Do never install a drier to this R410A unit in order to guarantee its lifetime.
5) The drying material may dissolve and damage the system.
6) Incom;ete aring may cause refrigerant gas leakage.

Other manuals for Haier AB18CS1ERA

Related product manuals