EasyManua.ls Logo

Haier AB36NACBEA - Page 26

Haier AB36NACBEA
143 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
8
260
260
(2) Ceiling height
Indoor unit can be installed on ceiling of 2.5-3m in height. (Refer to Foeld setting and Installation
Manual of ornament panel.)
(3) Install suspending bolt. Check if the installation place is strong enough to hold weight. Take
necessary measures in case it is not safe. (Distance between holes are marked on paper pattern.
Refer to paper pattern for place need be reinforced)
Installation space
Air inlet
Air outlet
2500 Over
Air outlet
1500 Over
1500 Over
1500 Over
1500 Over
Air outlet
Air inlet
Air inlet
5.1.3.3 Preparation
(1) Position of ceiling opening between unit and suspending bolt.Unit: mm
- 21 -
INSTALLATION INSTRUCTIONS
50~100
Roof
Anchor bolt
Long nut
Suspending bolt
Ceiling
(2) Cut an opening in ceiling for installation if necessary. (when ceiling already exists.)
Refer to paper pattern for dimension of ceiling hole.
Connect all pipings (refrigerant, water drainage), wirings (inter unit cable) to indoor unit, before
installation.
Cut a hole in ceiling, may be a frame should be used to ensure a smooth surface and to prevent
vibration. Contact your real estate dealer
(3) Install a suspending bolt.
(Use a M10 bolt)
To support the unit weight, anchor bolt shall be used in the case of already exists ceiling. For new
ceiling, use built-in type bolt or parts prepared in the field.
Before going on installing adjust space between ceiling.
<Installation example>
Note: All the above mentioned parts shall be prepared in field.
890(Ceiling opening)
(Distance between suspending bolts)
1070
515
515
(Distance between suspending bolts)
860(Ceiling opening)
780
20 Over

Related product manuals