EasyManua.ls Logo

Haier AD140S2SM3FA - Page 174

Haier AD140S2SM3FA
257 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
171
Maintenance Site Requirements
Leak Detection Methods
The maintenance site shall be provided with favorable ventilation and must be at. Arrangement of the
maintenance site inside the basement is not allowed.
Welding zone and non-welding zone shall be divided at the maintenance site, and shall be clearly marked. A
certain safety distance must be guaranteed between the two zones.
Ventilators shall be installed at the maintenance site, and exhaust fans, fans, ceiling fans, oor fans and dedicated
exhaust duct can be arranged, to meet the requirements of ventilation volume and uniform exhaust, and to avoid
accumulation of refrigerant gas.
Leak detection equipment for ammable refrigerant shall be equipped, with relevant management system being
established. Whether the leak detection equipment is under available state shall be conrmed before maintenance.
Sufcient dedicated vacuum pumps of ammable refrigerant and refrigerant charging equipment shall be
equipped, with relevant management system for maintenance equipment being established. It shall be guaranteed
that the maintenance equipment can only be used for vacuumizing and charging of one type of ammable
refrigerant, and mixed usage is not allowed.
The master power switch shall be arranged outside the maintenance site, with protective (anti-explosive) device
being equipped.
Nitrogen cylinders, acetylene cylinders and oxygen cylinders shall be placed separately. The distance between
the gas cylinders above and the working area involved in open re shall be at least 6m. The anti-backre valve shall
be installed for the acetylene cylinders. The color of the acetylene cylinders and oxygen cylinders installed shall
meet the international requirements.
The warning sign of " No Fire" , "No Smoking", or"Anti static"shall be arranged inside the maintenance area.
Fire control device suitable for electric appliance such as the dry powder extinguisher or carbon dioxide
extinguisher shall be equipped, and shall always be under the available state.
The ventilator and other electrical equipment at the maintenance site shall be relatively xed, with standardized
pipe routing. Temporary wires and sockets at the maintenance site are not allowed.
The environment in which the refrigerant leakage is checked shall be free from potential ignition source. Leak
detection with halogen probes (or any other detector with open re) shall be avoided.
For the system containing ammable refrigerant, leak detection may be realized with electronic
leak detection equipment. During leak detection, the environment in which the leak detection equipment is
calibrated shall be free from refrigerant. It shall be guaranteed that the leak detection equipment will not become
potential ignition source, and is applicable to the refrigerant to be detected. Leak detection equipment shall be set
at a percentage of the LFL of the refrigerant and shall be calibrated to the refrigerant employed, and the appropriate
percentage of gas (25 % maximum) is conrmed.
The uid used for leak detection shall be applicable to most of the refrigerant. The use of chlorine-containing
solvent shall be avoided, to avoid chemical reaction between chlorine and refrigerant and corrosion to copper
pipelines.
In case leakage is suspected, the open re at the site shall be evacuated or be put out.
In case welding is required at the leakage position, all the refrigerants shall be recovered, or be isolated at a
position far from the leak point with a stop valve. Before and during welding, the whole system shall be puried
with OFN.

Other manuals for Haier AD140S2SM3FA

Related product manuals