24
In the Case of Ceiling Already Exisls
(1) Install unit temporally
Put suspending bracket on the suspending bolt.
Be sure touse nut and washer at both ends of the bracket. Fix the bracket rmly.
• Outdoor is precharged with refrigerant.
• Be sure tosee the Fig.1, when connecting and removing piping from unit.
• For the size of the are nut, please refer to Table 1.
• Apply refrigerant oil at both inside and outsid of lare nut. Tighten it band tight 3-4 turns then tighten it.
• Use torque specied in Table 1. (Too much force may damage are nut, causing gas leakage).
• Check piping joints for gas leakage. Insulate piping as shown in Fig. below.
• Cover joint of gas piping and insulator 7 with seal.
(2) Adjust the height and position of the unit. (Refer to preparation for the installation (1) ).
(3) Proceed with
and
of "In the case of new ceiling".
Refrigerant Piping (As for outdoor piping, please refer to installalion manual of outdoor unit.)
Apple refrigerant oil
Torque spanner
Medium size seal pad ⑪ (accessory)
Cover the piping joint
with seal pad)
Clamp
Liquid pipe
Gas pipe
Insulator (accessory)
(For liquid pipe)
Insulator (accessory)
For gas pipe
Tape (White)
Clamp
Self-provided stiff pipe
Clamp
Large size seal pad
(accessory)
4mm below
(accessory)
Spanner
Piping joing
Flare nut
Table 1
Pipe Size Tighten Torque A (mm) Flare Shape
φ6.35 1420-1720N.cm (144-176 kgf.cm) 8.3-8.7
9.52 3270-3990N.cm (333-407 kgf.cm) 12.0-12.4
12.7 4950-6030N.cm (490-500 kgf.cm) 12.4-16.6
15.88 6180-7540N.cm (630-770 kgf.cm) 18.6-19.0
19.05 9720-11860N.cm (990-1210 kgf.cm) 22.9-23.3
A
R0.4 - 0.8
90°±0.5°