EasyManua.ls Logo

Haier AS09GS1ERA - Page 75

Haier AS09GS1ERA
104 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
1U09BS2ERA
1U12BS2ERA
1U18FS2ERA
1.
Outdoor unit
Indoor unit
A
B
Outdoor unit
Indoor unit
A
B
A
B
Outdoor unit
Indoor unit
Oil trap
To bend a pipe, give the roundness as large as possible not to crush the pipe ,
ƽ
andthebendingradiusshouldbe30to40
mm or longer.
Connecting the pipe of gas side first makes working easier.
ƽ
TheconnectionpipeisspecializedforR410A.ƽ
Half union
Flare nut
Torque wrench
CAUTION
Be careful that matters, such as wastes of sand
s,water,
,etc.shallnotenterthepipe.
ThestandardpipelengthisC m.IfitisoverDm,thefunctionoftheunitwillbeaffected.Ifthepipe
has
to be lengthened, the refrigerant should be charged,
according to E g/m. But the charge of refrigerant
must
be conducted by profes
sional air conditioner engineer. Before adding additional refrigerant,
perform
air
purging from the refrigerant pipes and indoor unit using a vacuum pump,then
Spanner
Forced fastening without careful centering may
damage the threads and cause a leakage of gas.
Pipe Diameter(ǿ) Fastening torque
Liquid side6.35mm(1/4") 18N.m
Liquid/Gas side9.52mm(3/8") 42 N.m
Gas side 12.7mm(1/2") 55N.m
Gas side 15.88mm(5/8") 60 N.m
Max.Elevation:
In case the elevation A is more
than 5m, oil trap shoud be
installed every 5~7
Max. Length:
Incasethepipelength B is
more thanDm, the refrigerant
shouldbecharged,according
to E g/m.
Connection of pipes
charge
additional refrigerant.
Amax
Bmax
2.
Installation
74