EasyManua.ls Logo

Haier AU96NFTAHA - 3 Installation of the unit; 1. Convertible type unit

Haier AU96NFTAHA
131 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
6
3
Installation of the unit
990mm
655mm
500mm
245mm
65mm
125mm 100mm
65mm
530mm
450mm
35mm
70mm
1. Convertible type unit
AC092FEAHA, AC122FEAHA, AC162FEAHA
*
*
According to the position as shownin the left diagram, select a leading-out direction for pipeline and circuit.There are drain holes on the left sideand the right side that can be selectedaccording to the practical situation.After determining the leading-outdirections for pipeline, circuit anddrainpipe, make the wall outlet holesaccording to processing method ofwall outlet hole.
Installing the wall-hanging support
according to the diagram.
*
Installing the drain pipe
Install the drainpipe in the drain hole onthe left side and the right side (as shownin the diagram). Installing method is asfollows: Insert the drainpipe into the water
tray, as shown in the diagram, tighten it
with binding wire, then tighten the jointwith thermal insulating material.
Note: The leading-out direction of drainpipeis shown in the right diagram.
backward
rightward
leftward
left drain hole right drain hole
wall-hanging support
edge of unit
water tray
binding wire
drainpipe
water tray
thermal insulating
material
drainpipe
drainpipe should be low
externally and high internally
drainpipe
drainpipe
correct incorrect incorrect
Model
Liquid pipe (mm)
Gas pipe (mm)
AC092FEAHA
AC122FEAHA
AC162FEAHA
*6.35 *12.7
*6.35 *12.7
*6.35 *12.7
Все каталоги и инструкции здесь: http://splitoff.ru/tehn-doc.html

Table of Contents

Related product manuals