- 29 -
volume
B Additional refrigerant charging volume on site
Additional charging standard of liquid pipe
Liquid pipe
Dia.
25.4 22.22 19.05 15.88 12.7 9.52 6.35
Additional
charging
volume
per meter
kg/m
0.53 0.4 0.28 0.2 0.12 0.06 0.03
Calculating method of additional refrigerant charging volume
Charging volume of refrigerant pipe Additional charging
volume:
length of liquid pipe× additional charging amount per meter liquid pipe
Additional charging amount =L1×0.53+L2×0.4+L3×0.28
+L4×0.2+L5×0.12+L6×0.06+L7×0.03
L1: length of dia.25.4 liquid pipe
L2: length of dia.22.22 liquid pipe
L3: length of dia.19.05 liquid pipe
L4: length of dia.15.88 liquid pipe
L5: length of dia.12.7 liquid pipe
L6: length of dia.9.52 liquid pipe
L7: length of dia.6.35 liquid pipe
Remark: A, Charging volume when out of factory excludes refrigerant
in the pipe.
B, Actual additional charging amount should be within the
figure ±5%,which is calculated additional charging amount according
to the pipe length