EasyManua.ls Logo

Haier MRV5-H - Page 228

Haier MRV5-H
262 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
225
3. Installation of valve box
Use parts and components specied for installing the installation components.
(1) Change the installation direction of electric box according to requirements following the steps below; (see Fig.1)
Remove the cover of the electrical appliance box; (2 screws)
Remove the electrical appliance box; (4 screws)
Remove the top plate; (4 screws)
Change the outgoing direction of wiring (electronic expansion valve coil) between the equipment and the
electrical appliance box;
Rotate 180° to install the top plate;
Install the electrical appliance box;
Install the cover of the electrical appliance box.
Install the lifting tools on the lifting bolts according to the instruction of the Fig.6
Be sure to follow the stipulations on products locally purchased to use nuts (M8 or M10 of 3 pieces for 4 positions)
and gaskets (M8 with the outer diameter of 15/16~1 1/8(24~28) mm and M10 with that of 30~34 mm of 2 pieces for
4 positions) on the upper and lower sides of the lifting tools.
<Note>
Be sure that the product must be installed with the top surface (the oblique surface in the Fig.5) upward, or it will
not work well and increase the working noise.

Table of Contents

Related product manuals