EasyManua.ls Logo

HANLA HGS-100 User Manual

HANLA HGS-100
12 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
HANLA IMS CO., LTD.
1610-5 SONGJEONG-DONG GANGSEO-GU BUSAN KOREA
-Tel: 82-51-601-3000
-Fax: 82-51-831-1850
-Email: hanla@hanlaims.co.kr
MT-HGS-100NEW SYSTEM
Rev.9
2010-07-13
Page 1/58
HGS-100
TECHNICAL MANUAL
¾ Hydrocarbon Gas Sampling & Detection System
Question and Answer IconNeed help?

Do you have a question about the HANLA HGS-100 and is the answer not in the manual?

HANLA HGS-100 Specifications

General IconGeneral
DisplayLCD
Operating Temperature-10°C to 50°C
Storage Temperature-20°C to 60°C
Power Supply9V battery
Weight300 g

Summary

Introduction

Operating Principle

Explains how the hydrocarbon gas detector system monitors gas concentration and alarms.

Specifications

Analyzing Unit Specifications

Details the technical specifications of the Analyzing Unit, including channels, capacity, and inputs.

Technical Data for Each Component

Analyzing Unit Technical Data

Provides detailed technical data for the Analyzing Unit, including sampling, A/D conversion, and alarms.

Gas Detectors

Discusses the types and locations of gas detectors used in the HGS-100 system.

Operation

Gas Concentration Alarms

Covers the types and triggers for gas concentration alarms in the system.

System Alarms

Details various system alarms, their sequences, and shutdown procedures.

Installation and Commissioning

Commissioning

Outlines the steps and procedures for commissioning the system after installation.

Configuration Menu F5

Describes the configuration options accessible through the F5 menu for system setup.

Detector Setting and Calibration Menu

Details the menu options and procedures for setting and calibrating gas detectors.

Detector Calibration Menu

Details the menu options and procedures for calibrating gas detectors.

Channel Setting

Details the configuration settings for sampling channels.

Commissioning Checks

Lists various checks to be performed after system commissioning.

Trouble Shooting