- Study of the electric schematics
HA26 RTJ O - HA26 RTJ O SW - HA26 RTJ PRO - HA26 RTJ PRO SW - HA80 RTJ O - HA80 RTJ PRO
2.5.10 - Basket rotation
2.5.10.1 - Validation
REQUIREMENTS DEFINITION
PRV03
Left (L) or right (R) platform rotation is inhibited if at least one of the following cut-off conditions is active :
CUT-OFF L R GENERAL CUT-OFF CONDITIONS
1 General
1 1 1 Generator is running
2 1 1 Maximum number of running movements is reached
3 1 1 Safety valves tool is active
411
Upper controls emergency stop pushed and
overriding mode not active
511
Delay to change fuel selection (dual fuel engines
only)
REQUIREMENTS DEFINITION
PRV03
CUT-OFF L R
SIMULTANEOUS MOVEMENTS CUT-OFF
CONDITIONS
2
Simultaneous
movements
1..10 1 1
Requirements SM_CE_03 | SM_AU_02 |
SM_ANSI_02
REQUIREMENTS DEFINITION
PRV03
CUT-OFF L R OVERLOAD CUT-OFF CONDITIONS
3 Overload 1 1 1 Overload alarm is active
REQUIREMENTS DEFINITION
PRV03
CUT-OFF L R TILT CUT-OFF CONDITIONS
4 Tilt N/A N/A N/A N/A
REQUIREMENTS DEFINITION
PRV03
CUT-OFF L R REACH LIMIT CUT-OFF CONDITIONS
5 Reach limit N/A N/A N/A N/A