EasyManua.ls Logo

Hercules Montfoort Cruise F7 - Preparing a Break in Operation; Taking out of Operation

Hercules Montfoort Cruise F7
196 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Transportation, storage and assembly
034-11592_1.0_19.11.2018
54
5.2.1.1 Preparing a break in operation
Remove the battery from the bicycle.
Charge the battery to around 60% (three to four LEDs
of the charge status indicator light up).
The bicycle has to be cleaned with a damp cloth and
preserved with wax spray. Never wax the friction
surfaces of the brake.
Before longer periods without use, it is
recommendable to have your specialist dealer carry
out servicing and basic cleaning and apply
preservative agent.
5.2.1.2 Taking out of operation
Store the bicycle, battery and charger in a dry and
clean environment.
Charge the internal battery in the display every
3 months for at least 1 hour.
Check the charge status of the battery after
8 weeks. If only one LED of the charge status
indicator lights up, recharge the battery to around
60%.
EN_034-11592_1.0_0.01_19.08.2018_HERCULES BOSCH Purion MY19_Inhalt.book Seite 54 Montag, 19. November 2018 11:00 11

Table of Contents

Related product manuals