Do you have a question about the HERKULES RP 1100 B and is the answer not in the manual?
Brand | HERKULES |
---|---|
Model | RP 1100 B |
Category | Power Tool |
Language | English |
Details on engine power, displacement, fuel type, tank volume, oil, speed, vibration, working plate dimensions, compaction pressure, and weight for RP models.
Noise emission values including sound pressure, sound power, and vibration levels with uncertainty for RP models.
Steps for attaching the handle using bolts, washers, and nuts, including gas lever attachment.
Instructions for mounting the pre-assembled chassis using bolts, washers, and nuts.
Step-by-step guide to starting the engine using choke, fuel, throttle, and starter.
Procedure for stopping the engine by setting the gas lever and switch to OFF.
Safety instructions and precautions for operating the vibratory plate, including protective gear and work area safety.
Procedure for tensioning the V-belt after five operating hours by adjusting screws and nuts.
Procedure for tensioning the fan belt after five hours of use by adjusting screws and nut.
Instructions for changing engine oil after 20 and 100 operating hours.
Procedure for changing eccentric oil after 200 operating hours.
Additional safety precautions for petrol-driven machines regarding work areas and exhaust.
Safety instructions for refueling, including explosion risk and no smoking.
Machine conformity to EC directives and intended use for various surfaces.
Attaching the handle using bolts, washers, and nuts.
Mounting the chassis using bolts, washers, and nuts.
Step-by-step guide to starting the engine using choke, fuel tap, throttle, and starter switch.
Procedure for stopping the engine by setting the gas lever and switch to OFF.
Safety instructions and precautions for operating the vibratory plate, including protective gear and work area safety.
Tensioning the V-belt after five operating hours by adjusting screws and nuts.
Tensioning the fan belt after five hours of use by adjusting screws and nut.
Instructions for changing engine oil after 20 and 100 operating hours.
Procedure for changing eccentric oil after 200 operating hours.
General notes on unpacking, checking delivery, and familiarizing with the manual.
Noise emission values including sound pressure, sound power, and vibration levels with uncertainty.
Identifies symbols used on the machine for safety and operation.
Safety guidelines for personnel, machine condition, and work environment.
Specific safety advice for petrol-powered machines regarding enclosed spaces, exhaust, and hot parts.
Instructions for refueling with explosion risk warning and prohibition of smoking.
Machine conformity to EC directives and intended use for specific surfaces and tasks.
Identifies potential residual risks despite safety measures and how to minimize them.
Checking contents for transport damage and completeness after unpacking.
Steps for attaching the handle using nuts, washers, and bolts.
Mounting the wheel base to the brackets using nuts, washers, and bolts.
Step-by-step guide to starting the engine using choke, fuel supply, gas lever, and start switch.
Procedure for stopping the engine by setting the gas lever and switch to OFF.
Safety instructions and precautions for operating the vibratory plate, including protective gear.
Tensioning the V-belt after five operating hours by adjusting screws and nuts.
Tensioning the fan belt after five hours of use by adjusting screws and nut.
Instructions for changing engine oil after 20 and 100 operating hours.
Procedure for changing eccentric oil after 200 operating hours.
List of items included in the delivery package for RP models.
Detailed specifications for RP 800 B, RP 1100 B, and RP 1300 B models.
Noise emission values including sound pressure, sound power, and vibration levels with uncertainty.
Identifies safety symbols used on the machine for safe operation.
Safety guidelines for personnel, machine condition, and work environment.
Instructions for refueling with explosion risk warning and prohibition of smoking.
Lists potential hazards like pinching, falling, gases, shock, noise, burns, fire, and vibration with precautions.
Procedure for unpacking the machine, checking for damage, and reporting missing parts.
Connecting the handle using screws, washers, and nuts.
Mounting the wheel base to the brackets using screws, washers, and nuts.
Instructions for filling motor oil and starting the engine.
Steps to start the RP 800 B engine using choke, fuel, throttle, and starter.
Procedure for stopping the engine by setting the gas lever and switch.
Safety warnings and operating precautions for the vibratory plate.
Tensioning the V-belt after five operating hours by adjusting screws and nuts.
Tensioning the V-belt after five operating hours by adjusting screws and nut.
Procedure for changing engine oil after 20 and 100 operating hours.
Procedure for changing eccentric oil after 200 operating hours.
Identifies safety symbols used on the machine for safe operation.
Safety guidelines for personnel, machine condition, and work environment.
Instructions for refueling with explosion risk warning and prohibition of smoking.
Identifies potential residual risks despite safety measures and how to minimize them.
Lists hazards like pinching, falling, gases, shock, noise, burns, fire, and vibration with precautions.
Securing the handle with screws, washers, and nuts.
Steps to start the engine using choke, fuel tap, throttle lever, and starter switch.
Procedure for stopping the motor by setting the gas lever and switch.
Safety warnings and operating precautions for the vibratory plate, including protective gear.
Tensioning the V-belt after five operating hours by adjusting screws and nuts.
Tensioning the fan belt after five hours of use by adjusting screws and nut.
Procedure for changing engine oil after 20 and 100 operating hours.
Procedure for changing eccentric oil after 200 operating hours.
Lists symbols indicating safety measures for machine operation.
Transmits safety indications to all personnel working on the machine.
Provides safety guidelines for machine operators regarding environment, attention, and personal condition.
Identifies potential residual risks despite safety measures and how to minimize them.
Attaching the handle using bolts, washers, and nuts.
Mounting the chassis using bolts, washers, and nuts.
Steps to start the engine using choke, fuel tap, throttle, and starter switch.
Procedure for stopping the engine by setting the gas lever and switch.
Safety warnings and operating precautions for the vibratory plate, including protective gear.
Tensioning the V-belt after five operating hours by adjusting screws and nuts.
Tensioning the V-belt after five operating hours by adjusting screws and nut.
Procedure for changing engine oil after 20 and 100 operating hours.
Procedure for changing eccentric oil after 200 operating hours.
Lists symbols indicating safety measures for machine operation.
Familiarizing personnel with safety instructions before operating the machine.
Instructions for refueling with explosion risk warning and prohibition of smoking.
Identifies potential residual risks despite safety measures and how to minimize them.
Attaching the handle using bolts, washers, and nuts.
Mounting the chassis using bolts, washers, and nuts.
Steps to start the engine using choke, fuel tap, throttle, and starter switch.
Procedure for stopping the engine by setting the gas lever and switch.
Safety warnings and operating precautions for the vibratory plate, including protective gear.
Tensioning the V-belt after five operating hours by adjusting screws and nuts.
Tensioning the V-belt after five operating hours by adjusting screws and nut.
Checks to perform daily before starting work: fuel, oil, lines, filter, bolts.
Check V-belt and perform first motor oil change.
Clean air filter, replace if needed, check exhaust system.
Check and clean spark plug, perform subsequent oil changes.
Change oil in the eccentric housing.
Details about Woodster GmbH and product liability.
Advice on reading the manual for safe and proper machine operation.