Total Station Manual
- 138 -
Orthogonal
to station
stakeout
Length
Longitudinal distance:
Positive if measuring
point far away target
point.
Trav
Perpendicular distance:
Positve if measuring point
being right side of target
point.
[Road Stakeout] 2/3
Pt.
T.H.
Length ---
Trav. ---
Z/H ---
K+12.0
2.000 m
------
------
------
ALL DIST REC EDM
Cartesian
stakeout
Y/E
Difference of easting
coordinates.
X/N
Difference of northing
coordinates.
[Road Stakeout] 3/3
Pt.
T.H.
Y/E
X/N
Z/H
K+12.0
2.000 m
------
------
------
ALL DIST REC EDM
User can use [PAGE] key to switch method between these 3 methods.
Doing stakeout can refer to Point stakeout.
Steps
Steps
Key
Display
1 Pressing key [F4] enter
Road functions menu. Before
doing stakeout, job seting,
station seting, BS seting
should be done.
[F4]
[Road]
[*] F1 Set Job (1)
[*] F2 Set STA (2)
[*] F3 Set B.S. (3)
F4 Start (4)
F1 F2 F3 F4
2 Pressing [F4] enter road
stakeout.
[F4]
[Road]
F1 F2 F3 F4
F1 Road Manage (1)
F2 HC list (2)
F3 Vert. curve list (3)
F4 Road Stakeout (4)