EasyManua.ls Logo

Hitachi G1500 - Four-Rack Configuration - Two Controllers (Center)

Hitachi G1500
187 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Floor Load
Rating
(kg/m2)
Required Clearance (a+b) m
c= -0.3 c=0 c=0.2 c=0.4 c=0.6 c=0.8 c=1.0 c=1.4
350 2.3 1.8 1.6 1.3 1.1 1.0 0.8 0.5
300 3.5 2.9 2.5 2.2 2.0 1.8 1.6 1.2
Notes:
1. Actual clear
ances for installation should be determined after consulting with the
construction specialist r
esponsible for installations in the building. Clear
ances can
vary depending on the size/layout of the system and building conditions.
2. When various congurations of stor
age systems are arranged in a row, clearance
values based on the largest storage system conguration should be used.
3. For easier maintenance operations, make clearance (c) as large as possible.
Four-rack configuration - two controllers (center)
The following gure shows the service clearances for a four-rack, two-controller
conguration, with the controllers in the center two racks.
Four-rack conguration - two controllers (center)
Chapter 4: Site preparation specications
Hitachi Virtual Storage Platform G1000, G1500, and VSP F1500 Hardware Guide 93

Table of Contents

Related product manuals