The server rmware version must match the failed server; otherwise, the server
cannot properly r
estore from the backup le. See the release notes and system
installation guide for release-specic requirements.
4. Navigate to Home > Server Settings > License Keys to check the license keys to
ensure you have the correct set of new license keys.
5. Record the following information:
■ IP addresses for Ethernet ports 0 and 1
■ Gateway
■ Domain name
■ Host name
Shutting down the server you are replacing
On the server that you are replacing:
Procedure
1. From the server console, issue the command: shutdown --ship --powerdown
Wait until the console displays Information: Server has shut down, and the
rear panel LEDs turn o.
The PSU and server fans continue to run until you remove
the po
wer cables from the PSU module. See the appropriate system component
section for more information.
Note: This specic
powerdown command prepares the system for both
shipping, and potential long-term, post-replacement storage.
2. Unplug the power cords from the power supplies.
3. Wait approximately 15 seconds, and then conrm the NVRAM status LED is o.
If the LED is ashing or xed, press and hold the reset button for ve seconds until
the LED starts ashing. The battery disables when you release the reset button.
Shutting down the server you are replacing
Appendix A: Server replacement procedures
Hitachi NAS Platform and Hitachi Unied Storage Series 4000 Hardware Reference 101