The new server rmware version must match the failed server; otherwise, the
server cannot properly r
estore from the backup le. See the release notes and the
System Installation Guide for release-specic requirements.
4. Navigate to Home > Server Settings > IP Addresses to obtain:
■ Admin IP address and name
■ Cluster node IP address
The evs list command also displays these IP addresses.
Shutting down the servers you are replacing
On the servers that you are replacing:
Procedure
1. From the server console, issue the command: cn node shutdown --ship --
powerdown
(where node represents the targeted node)
Wait until the console displays Information: Server has shut down, and the
rear panel LEDs turn o. The PSU and server fans continue to run until you remove
the power cables fr
om the PSU module. See the appropriate system component
section for more information.
Note: This specic
powerdown command prepares the system for both
shipping, and potential long-term, post-replacement storage.
2. Unplug the power cor
ds from the power supplies.
3. Wait approximately 15 seconds, and then conrm the NVRAM status LED is o.
Shutting down the servers you are replacing
Appendix A: Server replacement procedures
Hitachi NAS Platform and Hitachi Unied Storage Series 4000 Hardware Reference 117